Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink SB-S-CURVE-PK

Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink

Sale price  $44.99 Regular price $82.99
Skip to product information
Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink SB-S-CURVE-PK
110
Ozbuyz Store · Registered Australian business

Weisshorn Sleeping Bag Single 213cm Thermal Camping Hiking Pink

SB-S-CURVE-PK
Sale price  $44.99 Regular price $82.99
Out of stock
Australia-wide deliveryDelivery cost and available options are shown for your product and postcode at checkout
Product warranty supportAt least one year unless a longer product-specific warranty is shown; Australian Consumer Law also applies
14-day change-of-mind returnsAvailable on eligible unopened products; conditions apply
Secure Australian checkoutEncrypted payment processing through Shopify
Ozbuyz Store · Australia Registered Australian business ABN 85 666 385 619
How delivery works

Enter your delivery address at checkout to view the delivery options and shipping cost for this product and postcode. Products are delivered through Australian warehouse and fulfilment networks.

Read our shipping and delivery policy
Secure payment options
  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa
Questions about this product? Send the product link and your delivery postcode for help with product and delivery questions. Ask on WhatsApp
For detailed enquiries or attachments Email support
Product information

Product details, delivery and support

Specifications, buying guidance and Australian customer protection without unnecessary repetition.

Australian online storeServing customers across Australia
Australian fulfilment networkDelivery is calculated for your product and postcode
Product warranty supportMost products include 12 months or longer
Registered businessABN 85 666 385 619
About this product
Weisshorn Outdoor Recreation > Camping > Sleeping Bags SKU SB-S-CURVE-PK

Experience year-round comfort with our premium 3-4 season sleeping bag, perfect for the Australian outdoors. With temperatures between -5 and 20 degrees, it ensures a cozy night's sleep from spring through to winter. Measuring a generous 213cm x 75cm, it offers plenty of room for adults to stretch out. The durable 190T polyester shell and soft-touch lining provide the perfect balance of warmth and breathability. Filled with 500gsm hollow fibre filling and lined with soft polyester pongee fabric, the sleeping bag is soft, lightweight and water-resistant. For added comfort, the two-way zipper at the bottom allows for easy foot ventilation, while the adjustable drawstring hood keeps you snug on chilly nights. Lightweight and highly portable, it packs down effortlessly into its compact carry bag-ideal for hiking and road trips. Planning a family adventure? We also stock the matching kids' version in our store so the whole family can stay cozy together! Durable, practical, and family-ready, it's the ultimate companion for your next camping getaway.

Features
500g/m2 hollow fibre filling
Soft polyester pongee lining
Suitable for -5 degrees to 20 degrees
Lightweight
Water-resistant
Colourful design
Adjustable tightening strap
Secure closure velcro
Double opening zippers
Comes with a carry bag

Specifications:
Color: Pink
Material: 190T polyester ripstop
Filling: 500gsm hollow fibre
Lining: 190T polyester pongee
Temperature range: -5 degrees to -20 degrees
Comfort rating: 10 degrees
External dimensions: 213m (L) x75cm (W)
Packed dimensions: 27m (D) x45cm (H)
Weight: 2kg

Package Content
Single Sleeping Bag x 1
Carry bag x 1

This product comes with 1 year warranty